LARGE EQUIPMENT
parallax background

LARGE FINISHING SYSTEMS FOR OVERSIZED PARTS AND COMPONENTS

Rohner's new line of pre-designed, production ready, large equipment finishing systems deliver proven performance with shorter lead times. Available to ship in as little as 10 weeks, we deliver large-scale powder booths, batch ovens, and cross-draft paint booths engineered to increase throughput, maintain consistent coating quality, and reduce production bottlenecks.

Check out our line of large equipment booths and ovens for your oversized fabricated products - from data centers and heavy equipment to aerospace parts and power generation.

Rohner provides the capacity, reliability, and performance needed to finish your largest projects - on schedule and ready for installation.

batch powder booth image

Batch Powder Booth
20' W x 16' T x 60' L

Our large format batch powder booths are designed for high-volume production in facilities finishing oversized components and parts.

Powder booth lead time: 10 weeks

*Call for pricing and reference large format batch powder booths.

Screenshot 2026-08-05 at 12.49.24 PM

Batch Oven
16' W x 14' T x 60' L

Our large format batch ovens can be used for a variety of industries and finishing  applications for oversized components and parts.

Batch oven lead time: 10 weeks

*Call for pricing and reference large format batch ovens.

cross draft booth image

Cross-Draft Booth
20' W x 16' T x 60' L

Our large format  cross-draft booths are designed for high-volume production in facilities finishing oversized components and parts.

Paint booth lead time: 10 weeks
MAU lead time: 14 weeks

*Call for pricing and reference large format cross-draft booths. 

GET A QUOTE

CONTACT US

made in the usa banner